The block plan said that Cycle 1 Testing had to start on Monday. That phase was defined as an end-to-end test, which means that the whole system, including all interfaces and screens had to be checked by a big group of end-users. The PMO (Project Management Office) was working hard to arrange all travel plans and schedules for all participants. They were setting up the reporting and all the managers were busy jumping from meeting to meeting to get everything prepared.
And there was a small team of developers working on the most important and complex part of the system. Those developers were working in isolation and following a different schedule. They were using an iterative and incremental process. They were using Scrum in a Waterfall environment. They were doing Scrummerfall or Scrummer#FAIL.
The team, composed mostly of software developers, was delivering new functionality at a two week schedule. They had a list of features to build which was sorted by business value (they called it Product Backlog) and as soon as they had a piece developed and tested, they all worked on the next feature. They switched to this way of working after trying for several months to develop the software following cryptic, badly written functional specifications which didn't really contain the information needed to develop a system. The project accepted them to use that approach, without really understanding the implications.
And then, suddenly it happened that Cycle 1 Testing had to start. It was stated in the block plan, it had to happen! People were finishing test scripts. Those scripts contained detailed steps which had to be run by business representatives to test complete business processes with the new system. Reports were made to monitor the progress of the testing team during the two week testing period.
Monday came, and all those business representatives arrived from different countries and sat together on a big kick-off meeting. They were told about the testing procedures, about environments and about how to document their test results. And they started testing.
Some hours later, the first reports were produced. Testing had started and some issues were found. At the afternoon, a shocker: testing couldn't continue, because the scenarios the testers were running had important issues. Some of the functionality they had to test was not yet developed!
A crisis meeting was set up. The managers sat in the conference room and discussed about how to deal with this tragic situation. The development team was not delivering as it should and that had to be fixed right away. The whole project was failing because of their inability to deliver at a proper speed. That was the general opinion of most managers in the round, but they didn't really know how to fix it.
The problem was not the development team or the developers. The problem was the plan and the organization. It gave to different, isolated groups of people tasks which were not coordinated, and which didn't give the incentive of working together towards the same common goal. But that was the elephant in the room, the truth nobody could really see.
So after hours of thinking and debating, there was at last a plan. The project needed more developers. They had to work faster - and that iterative working thing had to be looked in detail, it looks like developers were wasting too much time talking in retrospective meetings instead of sitting in front of their computers and coding.
Michael, our project manager came to me to tell me the "good news". At last they had found the solution for our problem, we just had to get more developers and everything would be fine. I was amazed by the fact that he really believed in what he was saying and for me it was so wrong. The solution was not to add more horsepower to the "machine" doing the coding, to deliver the system, the whole "factory" had to be reengineered.
If the developers continued to work in isolation, just getting some documents from some other teams, producing software and throwing it to other teams to test, it wouldn't work. We had to put everyone together, and let them deliver software piece by piece. The plan had to be completely changed. I told Michael about that but he told me I was wrong. He said that the project plan was the source of truth, it told everybody what had to be done when and nobody would change the plan. Besides that, we were already on Wave 9, it was the ninth time the company had to work on something like this, and the plan, which was a copy-paste from Wave 8 was proven to succeed. No time to do experiments.
Interviews for at least 10 new software developers had to start next week. For me, that was a frustrating day.
But there is more... read "Red is so Evil"!